Completed
2008
Location
New Plymouth
Studio
New Plymouth
A major renewal and interior re-theming project that included an initial phase of master planning. SGL Pool Consultants were part of the team to assist from the operational perspective durin ghte design phases. Also included int he Design Team was local artist, Michael Smithers, who helped develop flooring patterns. This interior re-theming project has been a huge success. The complex is vibrant, energetic and engaging for all visitors looking to use the pool hall, creche, fitness centre and outdoor pool. And having completed a subsequent stage, the centre also boasts the highest and fastest turbo slide in the country.